The documents are prepared and signed by a certified electrical specialist. This page sets out the rules, the types of certificate and how to check a certificate yourself.
When a certificate is required
| Work | What the source states | Source |
|---|---|---|
| Measurements for accepting a building into use | Wire and cable resistance, the phase-neutral loop, earthing and bonding resistance are tested by a certified electrical specialist certified by an accredited body (LVS EN ISO/IEC 17024) | LBN 261-15, point 55 |
| Installing the electrical installation | Takes place under the management of a construction specialist holding a certificate | LBN 261-15, point 55 |
| Microgenerator installation, inverter setup and settings protocol | Carried out only by a construction specialist with a BLEEA or LEB certificate that includes a power station or generating equipment specialisation | Sadales tīkls |
| Customer’s electrical installation for a new connection | The work is done by a qualified electrical specialist or an electrical installation company; the list of certified specialists can be found in BIS | Sadales tīkls |
| Moving a meter in a house or flat | The seal is removed and the work is done by a certified electrician | Sadales tīkls |
LBN 261-15 (Cabinet Regulation No. 294), point 55, likumi.lv; Sadales tīkls pages on microgenerators, permanent connections and meters. Checked on 25 November 2026.
The fire safety regulations currently in force (Cabinet Regulation No. 238, in force until 1 January 2027) do not name a construction specialist’s certificate for the periodic inspection once every 10 years. However, the report in Annex 6 comes with a copy of the electrical safety group card of the person doing the work, a copy of the instrument’s calibration or verification certificate and the electrical installation diagram (points 1.1–1.3 of the notes to the annex). If a property manager or another client asks for the report, ask what kind of person they will accept to do the work.
What certificates electricians have
- Construction practice certificate in the design of electrical installations (Cabinet Regulation No. 169, sub-point 8.5): for preparing an electrical design.
- Construction practice certificate in managing and supervising electrical installation construction work (Cabinet Regulation No. 169, sub-point 8.11). These certificates are registered in the BIS register of construction specialists.
- Certificates in the non-regulated sphere, for example “Elektroietaišu montāža” (installation of electrical equipment) or “Elektroietaišu izbūve” (construction of electrical installations), issued by the BLEEA or LEB certification bodies.
- Generation specialisation: the certificate programme name includes power stations or generating equipment. This is exactly what Sadales tīkls requires for microgenerator papers.
An electrical safety group card is an occupational safety document. Sadales tīkls states that it does not treat it as a certificate for installing generating equipment.
How to check an electrician’s certificate
- BIS register Open the register of construction specialists on bis.gov.lv and search by name or certificate number. Sadales tīkls points to it as well. BLEEA and LEB certificates are checked using the issuer’s data.
- Scope Compare the scope of the certificate with the work. A designer’s certificate is not the same as a construction work manager’s certificate.
- Validity Make sure the certificate is valid.
- Generating equipment For solar panels, Sadales tīkls recommends checking four things: the issuer is BLEEA or LEB, the programme name includes the scope and the generation direction, the period of validity, and that the data match the person.
More on reading a certificate: how to check an electrician’s certificate.
What a certified electrician prepares with us
We carry out measurements and prepare documents for existing electrical installations in Riga and the Riga region. The documents are prepared and signed by a certified electrical specialist. For solar panels and batteries, the inverter settings protocol is signed by a specialist whose certificate covers generating equipment.
- Electrical installation measurements and test reports
- Electrical installation documents for the building authority
- Sadales tīkls papers for a connection
- Inverter settings protocol
- Electrical installation report
We do not install panels or chargers and do not repair faults. If the test finds a defect, an electrician puts it right, for example electrical installation repairs and construction, and then we prepare the documents.
What to write in the form
So that we understand which certificate and which document are needed in your case, include the following in the form:
- the address and type of the property (flat, private house, sauna, commercial premises);
- who is asking for the document: building authority, Sadales tīkls, property manager, bank or buyer;
- the name of the document as written in the requirement or on e-st.lv;
- whether there is an electrical design, an old diagram or earlier test reports;
- for solar panels: the inverter model and capacity.
After the site visit we tell you which documents are needed and quote the price.
What a certified electrician’s documents cost
- Site visit: €40
- Electrical installation measurements and report for a flat: from €170
- Measurements and documentation for putting a private house into use: from €230
- Electrical installation report: from €180
- Meter relocation, the electrician’s work: from €70 (the Sadales tīkls sealing fee is separate)
- Solar panel paperwork and inverter settings protocol: price after the site visit
Prices cover the electrician’s work and the documents. Sadales tīkls and building authority fees are separate. Full list: prices.
What it costs
| Job | Price |
|---|---|
| Electrical installation measurements and report for a flat Flat | from €170 |
| Measurements and documentation for putting a private house into use Private house | from €230 |
| Electrical installation report | from €180 |
| Meter relocation, the electrician’s work The Sadales tīkls sealing fee is separate | from €70 |
| Site visit The electrician’s call-out and check on site | €40 |
| Solar panel paperwork and inverter settings protocol Number and type of inverters, whether the inverter is on the Sadales tīkls list | Price after the site visit |
| Documents for Sadales tīkls Incoming supply, distribution board, phases, measurements | Price after the site visit |
Sources
- LBN 261-15, point 55: certified electrical specialist, LVS EN ISO/IEC 17024 checked 25 November 2026
- Cabinet Regulation No. 169, sub-points 8.5 and 8.11, BIS register checked 25 November 2026
- BLEEA/LEB generation specialisation, an electrical safety group is not a certificate, four checking criteria checked 25 November 2026
- Qualified electrical specialist or electrical installation company, list in BIS checked 25 November 2026
- Meter relocation: a certified electrician removes the seal checked 25 November 2026
- BIS register for checking an electrician checked 25 November 2026
- Regulation No. 238, points 56–57, in force until 1 January 2027 checked 25 November 2026
- General technical requirements, point 9: installation and inverter setup are carried out by a construction specialist with a generation specialisation checked 25 November 2026
- Sadales tīkls: an electricity network may be built by a qualified electrical specialist or an electrical installation company checked 25 November 2026