It is ordered when a decision has to be made: whether to buy a house, whether the installation may be used after a fire or flooding, whether the old wiring can still be left in place. Electrical installation report: from €180.
Which page for which situation
Each situation has its own page: who asks for the report, what you need to prepare and what is looked at first during the site visit.
Before buying a house: the buyer wants to know what they are buying before signing the contract. It also suits taking over a new flat from a developer.
For insurance: after damage, the insurer asks for an electrician’s written assessment of what has been damaged.
For a bank: for the loan file, the bank asks for a document on the condition of the electrical installation.
After a fire and after flooding: you need to understand which circuits can be switched on and which have to be replaced.
Old wiring: an inherited or old house, aluminium conductors, no earthing.
VUGD requirements: periodic testing under the fire safety regulations currently in force.
Electric car charger connection: whether the existing electrical installation and capacity suit a charger.
Report, protocol or test report: what is the difference
These words are often confused, but each document has its own source and its own place. The name is chosen according to who is asking for the document.
| Document | Where it is laid down | When it is needed |
|---|---|---|
| Test report (insulation, phase-neutral loop, earthing, lightning protection) | Regulation No. 238, point 57, form in Annex 6 | Periodic testing |
| Contact connection test report (thermal camera) | Regulation No. 238, point 58, Annex 7 | Together with periodic testing |
| Protocol with documents for the acceptance statement | LBN 261-15 point 53 | Putting a building into use |
| Approved reports on measurements | LBN 261-15 sub-point 53.4 | Putting a building into use |
| Inverter settings protocol | Sadales tīkls requirements for a microgenerator | Solar panels, battery |
| Electrical installation report on its condition | An electrician’s assessment when no form is prescribed | A purchase, a bank, after damage, old wiring |
Cabinet Regulation No. 238 “Fire Safety Regulations” (in force until 1 January 2027), points 57–58; LBN 261-15 point 53; the Sadales tīkls page on connecting a microgenerator. Checked on 25 November 2026.
If a bank, a buyer or another party asks for the document, ask what it has to contain and write it in the form. If measurements are also needed, they can be added to the report.
What is in the report
- The property address, the date and what was inspected: distribution boards, circuits, rooms.
- The condition found: protective devices, type of conductors, whether there is earthing and a residual current device (RCD).
- Measurement results, if measurements were taken.
- The defects found and what has to be put right before the installation can be used or other documents prepared.
- The specialist’s signature. The documents are prepared and signed by a certified electrical specialist.
The report describes the condition on the day of the site visit. If something is changed in the electrical installation afterwards, for example, circuits are added, the distribution board is replaced or defects are put right, the earlier report no longer describes what is there. Then ask for a new site visit or measurements after the changes.
When a report is not the right document
A report does not replace documents that have their own name and content in the regulations. If a house has to be put into use, the building authority needs the electrical installation test documentation and the documents named in LBN 261-15 point 53: see putting a house into use: electrics. If periodic testing is due, a test report under Annex 6 of Regulation No. 238 is needed. If the connection changes, a confirmation is submitted to Sadales tīkls on e-st.lv.
If you do not know which of these you need, write in the form who is asking for the document and what it is called in the letter or requirements. After the site visit we tell you which documents are needed and quote the price.
Price
- Electrical installation report: from €180
- Site visit: €40
Prices cover the electrician’s work and the documents. Sadales tīkls and building authority fees are separate. The price changes with the floor area of the property, the number of distribution boards and circuits and whether measurements are needed. Other prices: electrical installation testing prices.
What to write in the form
- The address and type of property: flat, private house, commercial premises.
- Why the report is needed and who is asking for it.
- What the party asking for it wants to see in the report, if they have put it in writing.
- Whether there are old documents: a design, diagram, earlier test reports.
- Whether the property has electricity and whether the distribution board will be accessible.
After the site visit we tell you whether a report is enough or whether you also need measurements and a test report.
Sources
- Regulation No. 238, points 57–58, Annexes 6 and 7, in force until 1 January 2027 checked 25 November 2026
- LBN 261-15 point 53 and sub-point 53.4 checked 25 November 2026
- Inverter settings protocol checked 25 November 2026