Sadales tīkls connection documents

Sadales tīkls connection documents concern the part of the electrical installation that belongs to you: from the point where the incoming cable is connected to the Sadales tīkls distribution cabinet to the last socket.

After you send the form, we contact you within 5 minutes

What it costs
Documents and electrician’s work for Sadales tīkls Depends on: whether the incoming supply and distribution board suit the new capacity, whether the main protective device has to be changed or a switch to 3 phases is needed, whether measurements are needed Price after the site visit
Site visit The electrician’s call-out and check on site, paid €40

All prices and how they are set

Request a site visit

The site visit is paid: €40.

After you send the form, we contact you within 5 minutes

Choose your situation

8
Illustration: an open electricity meter cabinet by a fence

Sadales tīkls builds and connects its own network, but for your installation a confirmation that it is ready has to be submitted on the e-st.lv portal. We test the installation on the customer side and prepare the electrician’s part of the documents in Riga and the Riga region.

Where the Sadales tīkls work ends and your responsibility begins

Sadales tīkls states that the user’s electrical installation begins where the incoming cable is connected to the Sadales tīkls distribution cabinet. The meter is usually at this boundary. Everything beyond it is yours: the incoming cable to the house distribution board, the board itself and the circuits.

The Electricity Trade and Use Regulations (Cabinet Regulation No. 635) lay down that the user is responsible for the technical condition of their electrical installation (point 44). Before connection the system operator may check the user’s electrical installation and request “written confirmation that the electrical installation is ready for voltage to be switched on” (point 99). In practice this is done on the e-st.lv portal.

Sadales tīkls writes that the customer’s installation may be built “only by a qualified electrical specialist or an electrical installation company” and that the list of certified specialists can be found in the Construction Information System (BIS).

Checked on 25 November 2026: Cabinet Regulation No. 635 of 7 November 2023, points 44 and 99 (likumi.lv/ta/id/347235); Sadales tīkls, “Permanent connection” and “Preparing a property to receive electricity” (sadalestikls.lv).

Your situation and the matching page

New Sadales tīkls connection: for a house or new build that has no electricity yet. It describes the Sadales tīkls steps and what has to be done on your side before the meter is installed.

Electricity connection for a land plot: for an empty plot where the house is still to be built. The distance to the network and the moment for submitting the confirmation matter.

Increasing electrical capacity and switching from 1 phase to 3 phases: when the connection is no longer enough for a heat pump, an electric car or a workshop.

Meter relocation: the meter has to be moved because of renovation or alteration, and the seal may be removed only with permission from Sadales tīkls.

Restoring an electricity connection: for an inherited or long-unoccupied house where the contract was terminated. Temporary electricity connection for a building site: while building work is under way.

Confirmation of readiness of the electrical installation: what this document is, who submits it and how it differs from the measurement protocol.

Connection work and Sadales tīkls fees

Situation What has to be submitted on e-st.lv Sadales tīkls fee (price list)
New permanent connection Application; after the installation is prepared, the confirmation Connecting the installation €117.21 (0.4 kV), with additional installation work €217.52; for building the network €101.36 / €132.68 / €184.15 per A depending on distance
Capacity increase without rebuilding the network Application; for a flat, the building manager’s written consent Connection fee €117.21 (0.4 kV)
Moving the meter within a house or flat Application for removing the seal Sealing fee according to the price list
Reconnection later than 30 days Application Connection €34.76 (0.4 kV) and the capacity maintenance fee for up to 24 months
Temporary connection for a building site Application with a valid building permit €117.21 or €217.52
Microgenerator Application; after installation, the confirmation with annexes Assessment €78.66

Fees according to the Sadales tīkls price list, checked on 25 November 2026 (sadalestikls.lv/lv/cenradis). Check the current price list before applying.

Does Sadales tīkls need a measurement protocol

The confirmation and the measurement protocol are different documents. The customer submits the confirmation on e-st.lv, confirming that the installation has been built and is ready for voltage to be switched on. The Sadales tīkls public pages do not name a measurement protocol as an annex for an ordinary connection.

Measurements with a test report are required in other cases: when putting a building into use under LBN 261-15 and in the periodic test under the fire safety regulations. If you are connecting a new house, these papers can be prepared in one go, see putting into use. If we find defects during the test, an electrician puts them right before the papers are prepared, for example electrical installation repairs in Riga.

Price of documents for Sadales tīkls

  • Documents and electrician’s work for Sadales tīkls: price after the site visit. The price depends on: whether the incoming supply and distribution board already suit the new capacity; whether you need to change the main protective device or switch to 3 phases; whether measurements are needed; Sadales tīkls fees according to its price list (separate).
  • Site visit: €40.

After the site visit we tell you which documents are needed in your case and quote the price. Prices cover the electrician’s work and the documents. Sadales tīkls and building authority fees are separate.

We work in Riga and the Riga region, for example, in Mārupe and Ķekava. The Sadales tīkls connection rules are the same throughout the country.

What to write in the request form

  • Address and type of property: private house, flat, land plot, building site.
  • What you are planning: a new connection, more capacity, 3 phases, meter relocation, reconnection.
  • The present rated current of the main protective device in amperes and the number of phases, if you know them.
  • Whether an e-st.lv application has already been submitted and what Sadales tīkls replied.
  • Photos of the distribution board and the meter location.

Sources

  1. Cabinet Regulation No. 635 of 7 November 2023 “Electricity Trade and Use Regulations”, points 44 and 99 checked 25 November 2026
  2. Permanent connection: confirmation on e-st.lv, qualified electrical specialist, capacity maintenance fee checked 25 November 2026
  3. The boundary between the network and the customer’s installation checked 25 November 2026
  4. Load changes checked 25 November 2026
  5. Meter relocation checked 25 November 2026
  6. Reconnection checked 25 November 2026
  7. Temporary connection checked 25 November 2026
  8. Sadales tīkls price list checked 25 November 2026

Page updated 25 November 2026.

Request documents for Sadales tīkls

Tell us the address, what you are planning and what Sadales tīkls has already replied.

Get a price

The site visit is paid: €40.

Questions: Sadales tīkls connection documents

Can I submit the confirmation to Sadales tīkls myself?

Yes, the customer submits the confirmation on e-st.lv. Sadales tīkls requires the installation to have been built by a qualified electrical specialist or an electrical installation company, so it is worth testing the installation before submitting.

Why do payments start after the confirmation if there is no electricity yet?

Sadales tīkls states that after the confirmation is submitted, the monthly capacity maintenance fee starts to be charged, even if the voltage has not yet been switched on. More: capacity maintenance fee.

Do you submit the e-st.lv application on my behalf?

The owner submits the application and the confirmation in their own e-st.lv account, while reconnection is usually requested by the electricity supplier. For meter relocation, Sadales tīkls also allows the electrician to submit the application. We prepare the electrician’s part and tell you what has to be stated in the application.

How quickly do you reply after I send the form?

After you send the form, we contact you within 5 minutes. The site visit is paid: €40.

Request documents for Sadales tīkls

Send a short request and we contact you within 5 minutes.

Request a site visit

The site visit is paid: €40.

After you send the form, we contact you within 5 minutes

Get a price we contact you within 5 minutes