Increasing electrical capacity

Increasing electrical capacity is a paid change with Sadales tīkls, requested on e-st.lv.

After you send the form, we contact you within 5 minutes

What it costs
Documents and electrician’s work for Sadales tīkls Depends on: whether the incoming supply and distribution board suit the new capacity, whether the main protective device has to be changed or a switch to 3 phases is needed, whether measurements are needed Price after the site visit
Site visit The electrician’s call-out and check on site, paid €40

All prices and how they are set

Request a site visit

The site visit is paid: €40.

After you send the form, we contact you within 5 minutes

Illustration: circuit breakers and a residual current device in a distribution board

If the existing connection is suitable and the network does not have to be rebuilt, Sadales tīkls is paid only for connecting the installation, but on your side the incoming supply and distribution board must withstand the new current. We check whether your installation is ready for more capacity and prepare the electrician’s part.

Why the new capacity also has to be checked in the house

Sadales tīkls can increase the main protective device up to the boundary, but beyond it are your incoming cable, distribution board and circuits. If they were built for a lower current, a larger main circuit breaker does not protect the cable. In the check we look at whether the cable cross-section, the distribution board and the protective devices suit the new capacity.

Point 44 of the Electricity Trade and Use Regulations (Cabinet Regulation No. 635) lays down that the user is responsible for the technical condition of their electrical installation. So the Sadales tīkls reply “the capacity can be increased” does not mean that the house distribution board is ready. New capacity may be needed, for example, for a heat pump, electric heating or an electric car charger.

If the main protective device in a residential building is to be above 32 A, LBN 261-15 point 8.3 requires a three-phase connection. The capacity increase then also becomes a switch from 1 phase to 3 phases.

Checked on 25 November 2026: LBN 261-15 point 8.3 (as worded by Cabinet Regulation No. 355 of 17 June 2025), likumi.lv/ta/id/274674.

Sadales tīkls capacity increase: two scenarios

Case What Sadales tīkls does What the customer pays
The existing connection is suitable Increases capacity without rebuilding the network The connection fee of €117.21 (0.4 kV)
The network has to be rebuilt Issues technical requirements, a design is needed Construction and connection
Increase within 2 years of a new connection Applies a per-ampere fee The per-ampere fee if the property is within 50 m (connected before 1 May 2025) or within 300 m (from 1 May 2025)

According to the Sadales tīkls price list and the page “Load changes”, checked on 25 November 2026 (sadalestikls.lv). The deadlines are those of Sadales tīkls.

Increasing electrical capacity in a flat

A flat owner has to attach the building manager’s written consent to the application. So start by talking to the building manager, who can tell you whether the common installation of the building allows a larger load for your flat.

The distribution board check and measurements for the flat can be combined with electrical installation testing in a flat.

When more capacity is not needed at all

The Sadales tīkls advice on electric car charging mentions that a typical private house connection has three phases with 20–25 A (13.8–17.3 kW) and that a smart charger with dynamic load management often makes it possible to manage without increasing capacity. Before applying, it is worth adding up what will really run at the same time.

Sadales tīkls carries out a capacity reduction on the day after the application and charges no fee for it, but returning to higher capacity is paid. Solar panel owners may reduce capacity only as far as the phases and capacity needed by the system are kept.

What to prepare before the test

  • The present rated current of the main protective device in amperes and the number of phases (shown on the main circuit breaker).
  • A list of new appliances: heat pump, cooker, charger, workshop equipment.
  • Access to the incoming distribution board and the house distribution board.
  • For a flat: the building manager’s contact or the consent already received.

How much does a capacity increase cost

Sadales tīkls fees are separate and shown in the table above. For the electrician’s work:

  • Documents and electrician’s work for Sadales tīkls: price after the site visit. The price depends on: whether the incoming supply and distribution board already suit the new capacity; whether you need to change the main protective device or switch to 3 phases; whether measurements are needed; Sadales tīkls fees according to its price list (separate).
  • Site visit: €40.

Prices cover the electrician’s work and the documents. Sadales tīkls and building authority fees are separate.

Sources

  1. Load changes: fee, building manager’s consent, reduction checked 25 November 2026
  2. Sadales tīkls price list checked 25 November 2026
  3. Latvian Construction Standard LBN 261-15 “Internal Electrical Installations of Buildings” (Cabinet Regulation No. 294 of 9 June 2015) checked 25 November 2026
  4. Cabinet Regulation No. 635 of 7 November 2023 “Electricity Trade and Use Regulations”, points 44 and 99 checked 25 November 2026
  5. Typical private house connection, dynamic load management checked 25 November 2026

Page updated 25 November 2026.

Check your installation for more capacity

Tell us the current and required capacity and which appliances you are planning.

Get a price

The site visit is paid: €40.

Questions: Increasing electrical capacity

Does a capacity increase need an electrician if Sadales tīkls does everything itself?

Sadales tīkls changes its part up to the boundary. Whether your incoming cable and distribution board withstand a higher current has to be checked by an electrician, because the user is responsible for the condition of the installation (Regulation No. 635, point 44).

Does a capacity increase need a design?

If Sadales tīkls has to rebuild the network, it issues technical requirements and a design is needed. If the existing connection is suitable, Sadales tīkls increases the capacity and the customer pays the connection fee of €117.21 (0.4 kV) according to the price list.

How long does a capacity increase take?

It depends on whether Sadales tīkls has to rebuild the network. If it does, a design and construction work are needed first. After applying, ask Sadales tīkls for the timeframe for your connection.

Can I increase capacity for the winter only?

The capacity can be reduced later, and Sadales tīkls does this on the next day. Increasing it again is paid again, so compare both fees before the season changes.

Can a solar panel owner reduce capacity?

Yes, but only as far as the phases and capacity needed by the system are kept.

Check your installation for more capacity

Fill in the form: name, phone and address. After you send the form, we contact you within 5 minutes.

Request a site visit

The site visit is paid: €40.