It is ordered, for example, after rewiring or renovation, before selling or renting out the flat, and when the protective devices start to trip. There is a public price for a flat: from €170.
What is tested in a flat
Flat electrical installation measurements cover what lies within the flat: the flat’s distribution board, the circuits for sockets, lighting and fixed appliances, for example the cooker or water heater.
- insulation resistance of each circuit;
- phase-neutral loop impedance, to see whether the circuit breakers will operate at the moment of a fault;
- the connection of the protective conductors to the distribution board;
- residual current devices (RCD): whether the socket and lighting circuits have them and whether they operate. Since 1 July 2025 point 28.¹ of LBN 261-15 has required this for new and altered installations; for an older installation the report records where there is no such device.
The building’s incoming distribution board, stairwell boards and building earthing are the shared part of an apartment building. They are tested in electrical installation testing in an apartment building, which the property manager or flat owners’ association orders.
When flat electrical installation testing is needed
| Situation | Why | What to order |
|---|---|---|
| After rewiring or rebuilding the distribution board | Point 52 of LBN 261-15 requires testing after significant changes | Measurements and report for a flat |
| Periodic inspection | Regulation No. 238, point 56: once every 10 years, for flats too (in force until 1 January 2027) | Report following Annex 6 |
| Before selling or buying | A report can be useful in negotiations; if a bank or buyer asks for a document, ask which one | Measurements and report or a report before buying |
| Capacity increase | Sadales tīkls requires the property manager’s written consent for load changes in a flat | Capacity increase papers |
Checked on 25 November 2026: LBN 261-15 (likumi.lv/ta/id/274674), Regulation No. 238 (likumi.lv/ta/id/281646, in force until 1 January 2027), Sadales tīkls “Load changes” (sadalestikls.lv/lv/slodzes-izmainas).
Electrical installation testing for a rental flat
Electrical installation testing for a rental flat can be useful; if an insurer or tenant asks for a document, ask which one exactly. The periodic inspection once every 10 years under the fire safety regulations currently in force (Cabinet Regulation No. 238) applies to the property regardless of who lives in it, and the owner is responsible for it.
An electrical report for a rental flat can be useful at two moments: before handing the flat to a tenant, so that the owner knows its condition, and after the tenant moves out, if doubts about damage arise. A change of tenant is also a convenient time for the periodic inspection, because the flat is empty and access to all rooms is simple.
How testing in a flat goes
- Form Write down the address, floor, approximate floor area, location of the distribution board (in the flat or the stairwell) and who is asking for the report.
- Site visit A visit to the property costs €40. The electrician looks at the distribution board and circuits and says which measurements are needed.
- Testing For some measurements circuits are switched off, so the flat will be without power for a while.
- Report The results are recorded in the report. If a circuit does not meet the standard, an electrician has to repair it first.
What to prepare for flat testing
- Access to all rooms, including the storeroom and balcony, if there are sockets or lighting there.
- If the meter or distribution board is in the stairwell and locked, arrange access with the property manager.
- A diagram received during renovation, if there is one.
- A photo of the flat’s distribution board to attach to the form; from it the number of circuits can be estimated even before the site visit.
What electrical installation testing in a flat costs
- Electrical installation measurements and report for a flat: from €170
- Site visit: €40
Prices cover the electrician’s work and the documents. Sadales tīkls and building authority fees are separate. The price is affected by the floor area of the flat, the number of circuits and whether another document is needed, for example an as-built diagram.
Sources
- LBN 261-15 Internal Electrical Installations of Buildings (Cabinet Regulation No. 294 of 9 June 2015) checked 25 November 2026
- Cabinet Regulation No. 238 “Fire Safety Regulations”, points 56–58, in force until 1 January 2027 checked 25 November 2026
- Sadales tīkls: load changes checked 25 November 2026