We carry out measurements and prepare test reports, as-built diagrams, installation reports and the papers for Sadales tīkls. We do not repair or install: we test the existing electrical installation and prepare the documents.
Which document is needed in which case
First you need to know who is asking for the document and under what name. The table shows the most common situations and the page where each one is explained in more detail.
| Situation | Document needed | Page |
|---|---|---|
| You built the house yourself and it has to be put into use | Electrical installation test documentation (Cabinet Regulation No. 529) | Self-built house |
| New build or alteration, and the building authority asks for electrical installation documents | A protocol with the documents listed in point 53 of LBN 261-15 | Documents for the building authority |
| The periodic inspection is due | Test report following Annex 6 to Regulation No. 238 | Periodic testing |
| New connection or more capacity | Confirmation on e-st.lv that the electrical installation is ready | Documents for Sadales tīkls |
| Solar panels are installed and you need permission for parallel operation | Inverter settings protocol and confirmation | Inverter settings protocol |
| You are buying a house or flat and want to know the condition of the electrical installation | Electrical installation report (can be useful) | Check before buying |
Electrical installation measurements and test reports
Testing covers insulation resistance, the phase-neutral loop (the total impedance of the circuit, which determines whether the circuit breaker will trip on a fault), earthing and, where needed, the residual current device (RCD) and lightning protection. The results are set out in a report or protocol under the name that the relevant regulation requires. More: electrical installation measurements and testing.
Electrical installation measurements and report for a flat: from €170. A single measurement, for example earthing only: price after the site visit.
Documents for putting a house into use
Point 53 of LBN 261-15 lists what is attached to the building acceptance statement if the relevant works have been carried out: drawings, equipment passports, concealed works records and approved reports on the measurements. If you built the house yourself, Cabinet Regulation No. 529 requires electrical installation test documentation. More: putting a house into use: electrics.
Measurements and documentation for putting a private house into use: from €230. As-built diagram: price after the site visit.
Papers for Sadales tīkls
For a new connection or a capacity increase, Sadales tīkls asks the customer to submit on e-st.lv a confirmation that their electrical installation has been built and is ready. Sadales tīkls states that this work is done by a qualified electrical specialist or an electrical installation company. An electrician is also needed for a switch to 3 phases and for moving the meter, and before reconnection Sadales tīkls recommends having the installation checked. More: Sadales tīkls documents for a connection.
Meter relocation, the electrician’s work: from €70. Other Sadales tīkls documents: price after the site visit, with Sadales tīkls fees according to its price list charged separately.
Solar panel and battery paperwork
For a microgenerator (up to 11.1 kW on a three-phase or 3.7 kW on a single-phase connection), Sadales tīkls accepts an inverter settings protocol only from a specialist whose certificate covers generating equipment. Sadales tīkls also requires that the installation and inverter setup be carried out by a construction specialist with a certificate for generating equipment. We do not install panels. More: putting solar panels into use.
Solar panel paperwork and inverter settings protocol: price after the site visit. The Sadales tīkls assessment fee of €78.66 is separate.
Reports on the condition of the electrical installation
The report describes the condition of the electrical installation: after a fire or flooding, in an old house, before a purchase or when a third party asks for it. A bank or a buyer may ask for such a document, and it can be useful when making a decision. More: electrical installation report.
Electrical installation report: from €180.
Who may carry out measurements and sign documents
Point 55 of LBN 261-15 states that the tests referred to in sub-point 53.4 (wire and cable resistance, phase-neutral loop, earthing) are carried out by a certified electrical specialist certified by an accredited body in line with the standard LVS EN ISO/IEC 17024. The documents are prepared and signed by a certified electrical specialist. How to check any electrician’s certificate is explained on the page certified electrician in Riga.
LBN 261-15 (Cabinet Regulation No. 294), points 53–55, likumi.lv. Checked on 25 November 2026.
From your request to the documents
- Form Fill in the request form: the address, the situation and who is asking for the document (building authority, Sadales tīkls, bank, buyer).
- Contact After you send the form, we contact you within 5 minutes and clarify what is needed.
- Site visit The electrician comes to the property and looks over the electrical installation. Site visit: €40.
- Documents and price After the site visit we tell you which documents are needed and quote the price. If defects are found, an electrician has to put them right first.
Prices cover the electrician’s work and the documents. Sadales tīkls and building authority fees are separate. All prices in one table: electrical installation testing prices.
What to prepare before the site visit
- The address of the property and whether it is a flat, a private house, an outbuilding or commercial premises.
- Who is asking for the document and what it is called in the letter or requirements (building authority, Sadales tīkls, bank, buyer).
- Existing papers: the electrical design, an old diagram, earlier test reports, if there are any.
- Photos of the distribution board with its door open and of the meter.
- Access to the distribution board and the rooms on the day of the visit.
The more precisely you know which paper you need, the easier it is to state the scope of work and the price after the site visit.
What we do not do
- We do not install solar panels, inverters, batteries or electric car chargers.
- We do not repair faults or build electrical installations. If the test finds a defect, an electrician puts it right, for example electrician repairs and electrical installation work in Riga; after that the documents can be prepared.
- We do not sign documents without an inspection and do not backdate concealed works records.
Sources
- LBN 261-15, points 53–55: documents for the acceptance statement, insulation test, who carries out measurements checked 25 November 2026
- Cabinet Regulation No. 529: electrical installation test documentation for a self-built house checked 25 November 2026
- Regulation No. 238, points 56–58: periodic inspection, report in Annex 6 checked 25 November 2026
- Sadales tīkls: confirmation on e-st.lv, qualified electrical specialist checked 25 November 2026
- Microgenerator limits and the inverter settings protocol checked 25 November 2026
- Sadales tīkls assessment fee of €78.66 checked 25 November 2026
- General technical requirements, point 9: installation and inverter setup are carried out by a construction specialist with a generation specialisation checked 25 November 2026
- Sadales tīkls: an electricity network may be built by a qualified electrical specialist or an electrical installation company checked 25 November 2026