The protocol gives, for each circuit, insulation resistance, phase-neutral loop impedance, the earthing result and residual current device tripping. The as-built diagram, or electrical installation diagram, shows how the distribution board and circuits are actually built. Putting a house into use with the building authority needs both; for a business they serve as a basis for future tests.
A detached house or flat in Ķegums: what to measure before putting into use
Ķegums has detached houses, apartment buildings, technical and energy facilities and wooded outskirts. For a detached house, measurements are part of putting it into use; for a flat they are needed after rewiring. In both cases each circuit is measured separately, so electricity is switched off briefly during the measurements.
For a house, take the measurements when all circuits are connected and protective devices installed. If a room is not yet finished, its circuit will be marked as not connected in the protocol and will later have to be measured separately. If the house earth electrode is in the yard, say where it is: earthing resistance is measured there. If the property is by the Daugava or the hydroelectric reservoir and a sauna or boathouse on the bank has its own line, it should also be included in the protocol and diagram.
If the house has no connection yet and has to be connected to Sadales tīkls, measurements that need voltage can only be taken after connection. More: electrical installation testing in a house.
Workshop, warehouse or technical building: reports for a business
Ķegums is shaped by the hydroelectric station, the railway and the A6 road. If your business has a workshop, warehouse or service station here, electrical measurements are needed first of all by the owner, to know the condition of the installation, and by the tenant if the lease requires them.
A business building may have several distribution boards and three-phase equipment, so each board has its own part in the protocol. Before the site visit, prepare a list of distribution boards and say which equipment must not stop during measurements. If the building has lightning protection, it can be tested on the same visit.
More about this work: electrical installation testing for businesses.
Drawings and switching diagrams: what LBN 261-15 requires to be attached
Point 53 of LBN 261-15 states that a protocol with documents is attached to the acceptance statement of a building with electrical installations, if the relevant works have been carried out. These include a set of construction intention documentation drawings corrected under author’s supervision (53.1) and the installation’s automatic control and electrical switching diagrams (53.5).
Checked 25 November 2026: Latvian Construction Standard LBN 261-15 “Internal Electrical Installations of Buildings” (Cabinet Regulation No. 294 of 9 June 2015), point 53, likumi.lv.
| Document | What it is | When needed |
|---|---|---|
| Corrected set of drawings (53.1) | design drawings with changes made during construction | if the house was built to a design |
| Switching diagrams (53.5) | distribution board and circuit diagram, automation diagrams | if automation or a distribution board is installed |
| As-built diagram | diagram of the actual installation, if there is no design or it does not match | for an old house, alteration |
| Test protocol | measurement results circuit by circuit | for putting into use, after changes |
If the design is lost or what was built differs from it, the diagram is drawn from what is visible in the distribution board and cable routes. The A6 and the railway link Ķegums with Ogre, Riga and Lielvārde; if one of the earlier builders in another town holds the design, ask for it before the site visit. More: as-built electrical diagram.
Ogre Municipality building authority for Ķegums: if a contractor built the house
In Ķegums, construction matters are handled by the Ogre Municipality building authority. Its conditions for accepting a residential house say: if a building contractor builds the house, the construction log with as-built documentation and the test protocols for planned equipment are also submitted.
In that case the electrical measurements and the diagram, if one has been prepared, are part of the as-built documentation that the contractor attaches to the log. If the contractor has not handed over the electrical part or the firm no longer operates, the measurements can be taken again. If you built the house yourself, the list is different, and you submit the electrical installation test documentation as the builder. In your request, write who built the house and what papers there already are. How the electrical part fits into the building authority case is described on the page electrical installation documents for the building authority.
What measurements, reports and a diagram cost
Measurements and documentation for putting a private house into use cost from €230. For a business building we state the price after the site visit: it is determined by the floor area, the number of distribution boards and circuits and lightning protection. An as-built diagram is priced after the site visit, because it depends on the building’s area and number of floors and how many cable routes have to be traced on site. The site visit is paid: €40.
Prices cover the electrician’s work and the documents. Sadales tīkls and building authority fees are separate. The documents are prepared and signed by a certified electrical specialist.
Sources
- LBN 261-15, point 53: set of drawings (53.1), switching diagrams (53.5); point 55: certified electrical specialist checked 25 November 2026
- Ogre Municipality building authority covers Ķegums; contractor-built house: construction log and equipment test protocols; documentation issued by a certified electrician checked 25 November 2026
- The certificate is checked in the BIS register of construction specialists checked 25 November 2026