If you are building a house in the new quarters, you need two different papers: a confirmation for Sadales tīkls before the voltage is switched on and test documentation for the building authority before putting it into use. Both can be prepared after one site visit.
A flat in a Baloži apartment building: a report after rewiring
Baloži has apartment buildings, detached houses and wooded areas. After renovation, a flat owner has a narrow question: are the new circuits installed correctly and is there a paper to show it. The measurement report shows this circuit by circuit: insulation resistance, phase-neutral loop, earthing and residual current device tripping.
The report can be used by the owner, the building manager or the next buyer. If only the kitchen or bathroom has been rewired, say so in your request: the measurements will then mark which circuits are new and which remain old. If an electric cooker or water heater has its own line, it also gets a separate entry in the report.
Electricity in the flat is switched off briefly during the measurements, so access is needed only to the flat’s distribution board. If the flat’s protective devices are in a stairwell board, agree in advance who will open it. The process is described on the page electrical installation testing in a flat.
A new house on the Titurga side: documents for the building authority and reports
Titurga and other nearby residential areas extend Baloži beyond the historic centre, and new detached houses are being built there. If you build a second-group residential house yourself, the Building Construction Regulations require electrical installation test documentation for putting it into use. However, the Ķekava Municipality building authority list also includes other reports that should not be confused with the electrician’s papers.
The Ķekava Municipality list includes reports from the issuers of technical conditions on the readiness of utility networks, with AS “Sadales tīkls” given as an example. That is the network operator’s paper about the connection, not a measurement protocol. The list also includes the amended part of the building design and a chimney sweep’s report on the flues. On the electrical side we prepare the measurements and diagram; others prepare the remaining documents.
This order saves time: first the connection and the confirmation to Sadales tīkls, then measurements with the voltage on, then documents for the building authority. Without voltage, phase-neutral loop impedance and residual current device tripping cannot be measured, so a test protocol before connection would be incomplete.
If the location of the distribution board or the number of circuits has changed from the design, say so before the measurements: the changes have to show in the diagram. More: electrical installation test documentation for a self-built house.
Before the voltage is switched on: confirmation of readiness
If your house in the new detached-house quarters of Baloži has a new connection, a different paper matters. Point 99 of the Electricity Trade and Use Regulations (Cabinet Regulation No. 635) provides that before connecting, the system operator may check the installation and require a written confirmation that the electrical installation is ready to be energised. This confirmation is submitted to Sadales tīkls on the e-st.lv customer portal.
Checked 25 November 2026: Electricity Trade and Use Regulations (Cabinet Regulation No. 635 of 7 November 2023), point 99, likumi.lv.
Before submitting the confirmation, make sure that:
- the cable from the Sadales tīkls cabinet to the house distribution board is laid and connected;
- the distribution board has incoming protection matching the capacity applied for;
- the circuits are connected and labelled;
- the installation has been done by a qualified electrical specialist or electrical installation company, as Sadales tīkls puts it.
Sadales tīkls states that the monthly capacity maintenance fee starts after the confirmation, even if the voltage has not yet been switched on. So do not submit it too early. How the confirmation differs from a measurement protocol is explained on the page confirmation of readiness of the electrical installation.
The shared wiring of the whole building: risers, stairwell, basement
In Baloži apartment buildings, flat installations begin after the common part: the incoming distribution board, risers and stairwell circuits. This part is tested when ordered by the building manager or the flat owners’ community, not by an individual flat owner.
If a flat owner wants to increase capacity, Sadales tīkls requires the building manager’s written consent to be attached. The manager in turn needs to know whether the risers can carry it. Measurements and a diagram of the common part help answer that question with figures.
In your request, state the number of floors and stairwells, how many incoming distribution boards the building has and whether there is a basement or attic with its own circuits. More: electrical installation testing in an apartment building.
What a flat report and papers for a new house cost
Electrical installation measurements and a report for a flat cost from €170, and measurements and documentation for putting a private house into use from €230. For work for Sadales tīkls, such as the confirmation for a new connection, we state the price after the site visit. It depends on whether the incoming supply and distribution board already suit the new capacity and whether a switch to 3 phases is needed. The site visit is paid: €40.
Prices cover the electrician’s work and the documents. Sadales tīkls and building authority fees are separate. The documents are prepared and signed by a certified electrical specialist.
Sources
- Cabinet Regulation No. 635, point 99: written confirmation of readiness to be energised checked 25 November 2026
- Confirmation on e-st.lv, qualified electrical specialist, capacity maintenance fee after the confirmation checked 25 November 2026
- Building manager’s written consent for capacity changes in a flat checked 25 November 2026
- Ķekava Municipality list: utility network readiness reports (Sadales tīkls), chimney sweep’s report, amended parts checked 25 November 2026
- LBN 261-15, point 52: testing after significant changes checked 25 November 2026
- Electrical installation test documentation for a self-built house checked 25 November 2026
- Sadales tīkls: customer installation is done by a qualified electrical specialist or electrical installation company checked 25 November 2026