It is submitted on e-st.lv after a new connection has been built or capacity increased; for a new connection the meter is installed only after that. Before you submit it, we test the installation so that the confirmation states what is true.
What readiness of an electrical installation for switching on voltage means
Point 99 of the Electricity Trade and Use Regulations (Cabinet Regulation No. 635) allows the system operator to check the user’s electrical installation before connection and to request “written confirmation that the electrical installation is ready for voltage to be switched on”. Sadales tīkls implements this with the confirmation on e-st.lv. Point 44 lays down that the user is responsible for the technical condition of the electrical installation.
With the confirmation you state that the installation is ready for voltage to be switched on (Regulation No. 635, point 99). Sadales tīkls writes that the electrical network may be built only by a qualified electrical specialist or an electrical installation company.
Sadales tīkls recommends looking for the list of certified specialists in the BIS register of construction specialists. BLEEA and LEB certificates are checked using the issuer’s data. How to check a certificate and what its scope means is explained on the page how to check an electrician’s certificate.
Checked on 25 November 2026: Cabinet Regulation No. 635 of 7 November 2023, points 44 and 99, likumi.lv/ta/id/347235; Sadales tīkls, “Permanent connection” and “Preparing a property to receive electricity”.
Confirmation for Sadales tīkls: three cases
| Case | Confirmation | Annexes |
|---|---|---|
| New permanent connection | The installation is ready for voltage to be switched on | None named on the Sadales tīkls page |
| Capacity increase | The installation is ready for the new capacity | None named on the Sadales tīkls page |
| Microgenerator or battery | Confirmation that the microgenerator is ready for parallel operation | Copy of the construction specialist’s certificate, inverter settings protocol, photos of the inverter nameplate and the equipment |
More about microgenerators: inverter settings protocol.
A conformity confirmation for an electrical installation is not the same
The word “confirmation” appears in several documents. Sub-point 53.2 of LBN 261-15, on putting a building into use, mentions “conformity confirmations of the materials used”: these are the manufacturer’s or supplier’s documents about materials. For putting a building into use, BIS has the “confirmation of the building’s readiness for use”, approved by the participants in construction. The Sadales tīkls confirmation is a third one: your statement that the installation is ready.
The measurement protocol is also a different document. The Sadales tīkls public pages do not name it as an annex for an ordinary connection. Measurements with a test report are required when putting a building into use under LBN 261-15 and in the periodic test; see test protocol.
Checked on 25 November 2026: LBN 261-15 point 53 (likumi.lv/ta/id/274674); Regulation No. 529, point 167.¹ (likumi.lv/ta/id/269164).
What happens after submission
- For a new connection Sadales tīkls gets in touch about installing the meter within 2 working days.
- The monthly capacity maintenance fee starts to be charged, even if the voltage has not yet been switched on.
- The price list sets no separate fee for the confirmation itself; the price list charges for connecting the installation, €117.21 for a 0.4 kV connection (according to the Sadales tīkls price list, checked on 25 November 2026).
What to prepare before the test
- The Sadales tīkls contract or reply on e-st.lv.
- Information on who built the installation and whether there is a diagram.
- Access to the incoming cable, distribution board and circuits.
How much does a test before the confirmation cost
- Documents and electrician’s work for Sadales tīkls: price after the site visit. The price depends on: whether the incoming supply and distribution board already suit the new capacity; whether you need to change the main protective device or switch to 3 phases; whether measurements are needed; Sadales tīkls fees according to its price list (separate).
- Site visit: €40.
Prices cover the electrician’s work and the documents. Sadales tīkls and building authority fees are separate.
Sources
- Cabinet Regulation No. 635 of 7 November 2023 “Electricity Trade and Use Regulations”, points 44 and 99 checked 25 November 2026
- Confirmation on e-st.lv, meter installation, capacity maintenance fee checked 25 November 2026
- Annexes to the microgenerator confirmation checked 25 November 2026
- Latvian Construction Standard LBN 261-15 “Internal Electrical Installations of Buildings” (Cabinet Regulation No. 294 of 9 June 2015) checked 25 November 2026
- Cabinet Regulation No. 529 of 2 September 2014 “Building Construction Regulations” checked 25 November 2026
- Sadales tīkls price list checked 25 November 2026
- Sadales tīkls: the electrical network may be built by a qualified electrical specialist or an electrical installation company checked 25 November 2026