Electrical measurements and documents in Jūrmala - wooden summer houses, detached houses and guest houses

Electrical measurements and documents in Jūrmala start with what kind of property you have.

After you send the form, we contact you within 5 minutes

What it costs
Electrical installation report On the condition of the existing installation from €180
Measurements and documentation for putting a private house into use Private house from €230
Documents and electrician’s work for Sadales tīkls (new connection, capacity increase, phases, confirmation) Whether the incoming supply and distribution board are suitable, whether measurements are needed, Sadales tīkls fees separate Price after the site visit
Site visit The electrician’s call-out and check on site, paid €40

All prices and how they are set

Request a site visit

The site visit is paid: €40.

After you send the form, we contact you within 5 minutes

Illustration: a wooden residential building in Riga

If you have an old wooden house and do not know when the wiring was replaced, a report on its condition is the first useful step. If a summer house has been altered and has to be put into use, the building authority may need measurements and a diagram. For a guest house, an insurer may ask for papers, and it is worth knowing how long a test report stays valid.

A wooden house with wiring of unknown age: the electrical report and report validity

Jūrmala has historic wooden houses, detached houses, apartment buildings, hotels and seasonally used properties. In a wooden house altered piece by piece, one distribution board may have circuits from different decades. The electrical installation report describes what is in the board and the walls and what needs fixing first; we state the scope of measurements after the site visit.

The fire safety regulations currently in force (Cabinet Regulation No. 238, in force until 1 January 2027) require an electrical installation test once every 10 years. Their point 525 states that reports drawn up after 19 April 2016 are valid until the next test. If the house has such a report, check its date first: it determines whether a new test is needed or the existing report is enough.

Checked 25 November 2026: Fire Safety Regulations (Cabinet Regulation No. 238 of 19 April 2016), points 56 and 525, likumi.lv. The regulations are in force until 1 January 2027.

Jūrmala has sandy soils and pine forests. In sand, the earth electrode resistance can be higher than in damp clay, so in a house protocol the earthing resistance line is one of the most important. If the house has its own earth electrode in the yard, say where it is and whether anyone has changed it.

In a wooden house it is especially important to mark connections in the attic and under the cladding. For how this work is done, see the page old wiring survey.

A summer house after alteration: when papers for putting into use are needed

If you convert a seasonally used property into a year-round home, for example by insulating it, installing electric heating or increasing capacity, the question of putting it into use arises. Whether it has to go through putting into use afterwards depends on the construction case and is decided by the building authority. In Jūrmala, construction legality is ensured by the municipality, whose Urban Planning Administration includes the Building Inspectorate (page updated 23 December 2025).

The Construction Law states that since 1 January 2020 the construction administrative process is started electronically in BIS. The electrical papers therefore need to be prepared so that they can be added to the case in BIS. Before the measurements, check:

  • whether all new circuits are connected and labelled in the distribution board;
  • whether the electric heating and water heater lines have their own protective devices;
  • whether there is an old diagram or design to compare with what was built;
  • whether the house will have electricity in winter, if you plan the test out of season.

More about garden houses and summer houses: putting a garden house into use.

Guest house or hotel: a report an insurer may ask for

Jūrmala’s functions are a resort, tourism, living, hospitality and health services. An insurer may ask the owner of a guest house or hotel for a document on the condition of the electrical installation. What exactly is needed for this is set by the insurer, so find out what the insurer wants to see: a periodic test report or an electrical installation report with recommendations.

A periodic test report shows the measurement results. An electrical installation report additionally describes what is visible in the distribution board, what defects were found and what has to be done. If the guest house has several floors or buildings, say so in your request: the scope depends on it. More: electrical installation testing for insurance. If there is a previous test report or installation report, attach a photo of it.

A house that has stood without electricity: reconnection process and access

The A10 and the electrified railway line link Jūrmala with Riga, and in summer traffic and parking near the beach differ from winter. If you plan the site visit in summer, say in your request where a car can be parked near the house.

If the connection to a house has been cut off for a long time, after a reconnection application Sadales tīkls issues an invoice within 3 working days and restores the connection within 2 working days after payment. The reconnection application is submitted by the electricity supplier you choose. Beforehand it is worth testing the internal installation, because Sadales tīkls does not reconnect an installation that is not fit for use.

At the site visit, insulation and earthing are measured and the distribution board is checked. If everything is compliant, you can ask the electricity supplier to request reconnection. The process is described on the page electricity reconnection.

What a report and measurements for a Jūrmala property cost

An electrical installation report costs from €180. Measurements and documentation for putting a private house into use cost from €230. For work before reconnection or a capacity increase we state the price after the site visit: it depends on whether the incoming supply and distribution board are suitable and whether measurements are needed. The site visit is paid: €40.

Prices cover the electrician’s work and the documents. Sadales tīkls and building authority fees are separate. The documents are prepared and signed by a certified electrical specialist.

Sources

  1. Cabinet Regulation No. 238 (in force until 1 January 2027), point 56: test once every 10 years; point 525: reports after 19 April 2016 valid until the next test checked 25 November 2026
  2. In Jūrmala construction legality is ensured by the municipality; Urban Planning Administration, Building Inspectorate checked 25 November 2026
  3. Jūrmala building authority: the deadline does not change for the buyer of a structure not put into use (13 August 2020) checked 25 November 2026
  4. Construction Law, Section 14: process in BIS since 1 January 2020 checked 25 November 2026
  5. Reconnection: invoice within 3 working days, reconnection within 2 working days after payment; an unfit installation is not reconnected checked 25 November 2026

Page updated 25 November 2026.

Request a report or measurements in Jūrmala

State the part of town, whether the house is wooden and whether anyone lives in it in winter too.

Get a price

The site visit is paid: €40.

Questions about these documents

Does a guest house in Jūrmala need periodic electrical installation testing?

The fire safety regulations currently in force (Cabinet Regulation No. 238, in force until 1 January 2027) require an electrical installation test once every 10 years regardless of the property’s form of ownership, so for a guest house too. The results are recorded in a test report.

What should be considered when buying a building in Jūrmala that has not been put into use?

On 13 August 2020 the Jūrmala municipality building authority reminded that for a buyer acquiring a structure not yet put into use, the time allowed for construction works does not change. So before buying, find out how much time is left; an electrical test can be useful to learn what still needs sorting out.

How should access be described if the property is far from a station?

Jūrmala is long, and Majori, Bulduri, Kauguri and Ķemeri are far apart, so give the exact address in your request, the entrance from the street and, if the house is deep in a yard, how to find it. In summer, note where a car can be parked.

Request a report or measurements in Jūrmala

Fill in the form: name, phone and address. After you send the form, we contact you within 5 minutes.

Request a site visit

The site visit is paid: €40.

After you send the form, we contact you within 5 minutes

Get a price we contact you within 5 minutes