Temporary electricity connection for a building site

A temporary electricity connection for a building site is a Sadales tīkls connection for a period of up to 24 months, and it is granted only with a valid building permit.

After you send the form, we contact you within 5 minutes

What it costs
Documents and electrician’s work for Sadales tīkls Depends on: whether the incoming supply and distribution board suit the new capacity, whether the main protective device has to be changed or a switch to 3 phases is needed, whether measurements are needed Price after the site visit
Site visit The electrician’s call-out and check on site, paid €40

All prices and how they are set

Request a site visit

The site visit is paid: €40.

After you send the form, we contact you within 5 minutes

Illustration: an earth rod with a wire by the wall of a house

LBN 261-15 sets special requirements for the electrical installation of a building site. We check the site distribution board and installation, and later prepare the papers for the permanent connection and for putting the house into use.

Temporary Sadales tīkls connection: the rules

Type Period Condition Fee according to the price list
Temporary connection for a building site Up to 24 months A valid building permit €117.21, or €217.52 with additional installation work
Short connection for an event Up to 31 days Request 10 working days in advance According to the price list

According to the Sadales tīkls price list (the row on setting up a temporary connection for a building site) and the page “Temporary connection”, checked on 25 November 2026 (sadalestikls.lv).

Building site electricity connection: why it is different

Point 27 of LBN 261-15 lists places where special requirements according to standards apply to electrical installations, and one of them is construction sites (sub-point 27.4). On a building site the cables are outdoors, equipment is moved around and many people work with it. So the condition and protection of the site distribution board have to be checked before work begins.

For outdoor sockets up to 32 A used to connect portable equipment, point 28.¹ of LBN 261-15 requires a residual current device (RCD) with a rated operating current of no more than 30 mA.

Checked on 25 November 2026: LBN 261-15 sub-point 27.4 and point 28.¹, likumi.lv/ta/id/274674.

From a temporary to a permanent connection

The temporary connection ends, but the house needs a permanent one. Its steps are described on the page new Sadales tīkls connection: application, construction, your installation and the confirmation on e-st.lv. Request it in good time, because a permanent connection has its own steps and Sadales tīkls deadlines.

When the house is put into use, the documents under point 53 of LBN 261-15 are attached for the building authority, if the relevant work has been done. If the installation is covered by finishing, the concealed works records must be drawn up before it is covered, because they cannot be drawn up later. More: concealed works records.

If you build the house yourself as the builder (Construction Law Section 19.¹, paragraph three), the Building Construction Regulations (Regulation No. 529) require “electrical installation test documentation” for putting it into use (sub-points 157.7.1 and 168.1). More on this: self-built house.

Temporary power supply for construction: how it goes

  1. Building permit Make sure the building permit is valid; without it the temporary connection is not granted.
  2. Application on e-st.lv You request the temporary connection and the capacity needed.
  3. Site distribution board An installer or electrician installs the distribution board; we check it.
  4. Application for the permanent connection Request it in good time, before the temporary connection period ends.

What to prepare

  • The building permit and its validity period.
  • The capacity needed: cranes, concrete mixers, heaters.
  • The place where the site distribution board will stand.
  • If there is one: the design of the house’s electrical installation.

How much does a site distribution board check cost

  • Documents and electrician’s work for Sadales tīkls: price after the site visit. The price depends on: whether the incoming supply and distribution board already suit the new capacity; whether you need to change the main protective device or switch to 3 phases; whether measurements are needed; Sadales tīkls fees according to its price list (separate).
  • Site visit: €40.

Prices cover the electrician’s work and the documents. Sadales tīkls and building authority fees are separate.

Sources

  1. Temporary connection: 24 months, building permit, 31 days, 10 working days checked 25 November 2026
  2. Sadales tīkls price list checked 25 November 2026
  3. Latvian Construction Standard LBN 261-15 “Internal Electrical Installations of Buildings” (Cabinet Regulation No. 294 of 9 June 2015) checked 25 November 2026
  4. Cabinet Regulation No. 529 of 2 September 2014 “Building Construction Regulations” checked 25 November 2026

Page updated 25 November 2026.

Check the site distribution board

Tell us the address, the status of the building permit and the capacity needed.

Get a price

The site visit is paid: €40.

Questions about these documents

Can I get a temporary connection without a building permit?

No. Sadales tīkls grants a temporary connection for a building site with a valid building permit.

How long can a temporary connection be used?

For a building site, up to 24 months. For a short event, up to 31 days, applying 10 working days in advance.

Can a temporary connection be turned into a permanent one?

A permanent connection is a separate application with its own steps. Request it in good time, before the temporary connection period ends.

How much does a temporary connection for a building site cost?

According to the Sadales tīkls price list, checked on 25 November 2026: €117.21, or €217.52 with additional installation work. The electrician’s work on your side is separate.

Does the site distribution board need a residual current device?

Point 28.¹ of LBN 261-15 requires a device of no more than 30 mA for sockets up to 32 A to which portable equipment used outdoors is connected.

Check the site distribution board

Fill in the form: name, phone and address. After you send the form, we contact you within 5 minutes.

Request a site visit

The site visit is paid: €40.

After you send the form, we contact you within 5 minutes

Get a price we contact you within 5 minutes