What the fire safety regulations require of an electrical installation
Point 54 of Regulation No. 238 requires the electrical installation, including the earthing and lightning protection equipment, to match the solution in the construction intention documentation, to be kept in working order and to be operated in line with legislation and the manufacturer’s requirements. Point 56 sets the testing frequency, point 57 the report, point 58 the contact check with a thermal camera.
The regulations apply to properties regardless of the form of ownership: a flat, private house or business premises. The regulations do not name a construction specialist certificate for whoever carries out the test. However, attached to the Annex 6 report are a copy of the electrical safety group card of the person doing the work, a copy of the measuring instrument’s calibration or verification certificate and the electrical installation diagram (points 1.1–1.3 of the notes to the annex).
Cabinet Regulation No. 238 “Fire Safety Regulations” of 19 April 2016, points 54–58, likumi.lv. In force until 1 January 2027. Checked on 25 November 2026.
How often testing is needed
| Environment in the property or territory | Testing |
|---|---|
| Ordinary environment (flats, houses, offices, shops) | Once every 10 years |
| Explosive environment | Once every two years |
| Chemically aggressive environment | Once a year |
If the date of the last report is unknown, it is worth testing now and keeping the report for next time.
What is in the test report and the thermal camera report
- Test report (Annex 6) The results of testing the electrical installation’s insulation resistance, the phase-neutral loop impedance, the earthing resistance, the earth conductor continuity and the lightning protection system. The report also has the measuring instrument data and calibration certificate number.
- Contact connection test report (Annex 7) The quality of connections in junction boxes, the distribution board and where protective devices are installed is checked with a thermal camera, together with the tests under point 56.
The test report is based on the electrical installation diagram. If there is no diagram, one can be drawn from what is there: as-built diagram.
What will change after 1 January 2027
Regulation No. 238 ceases to be in force on 2 January 2027. As at 25 November 2026 the new fire safety regulations have not yet been published, so it cannot be said whether the 10-year period and the same report form will remain. If you test now, the report is prepared under the regulations currently in force.
Flat, house or business
- Flat: the flat’s electrical installation is tested from the flat’s distribution board. Testing of the building’s common property is organised by the building manager: testing in an apartment building.
- Private house: the whole electrical installation, earthing and, if there is one, lightning protection: periodic testing.
- Business: offices, shops, warehouses, production premises: testing for businesses.
What to prepare for the test
- The previous test report, if there is one: it shows when the last test was.
- The electrical installation diagram or electrical design.
- Information on lightning protection: whether there is any and where the earth electrodes are.
- Access to all distribution boards and rooms; in a business, agree which equipment may be switched off briefly during the test.
- If a tenant or building manager asks for the report, their requirements.
After the site visit we tell you which measurements and reports are needed and quote the price.
How much does testing for VUGD requirements cost?
- Electrical installation report: from €180
- Site visit: €40
- Electrical installation measurements and report for a flat: from €170
- Measurements and documents for businesses and apartment buildings: price after the site visit
- Thermal camera inspection of a distribution board: price after the site visit
Prices cover the electrician’s work and the documents. Sadales tīkls and building authority fees are separate. For businesses, the price changes with the floor area of the premises, the number of distribution boards and circuits, lightning protection and whether a thermal camera inspection is needed. Other prices: prices.