Maskavas iela, the Central Station and the market give good but busy access, and a shop or warehouse by the market has deliveries and working tills on a working day. For the site visit this means that the time has to be agreed around working hours, and the distribution board must be accessible at a moment when the electricity may be switched off for a while.
Shop, warehouse or workshop by the market: what to know before a report
Alongside housing, Maskavas forštate has the market, retail, logistics, cultural and social services. A shop or warehouse installation differs from a flat: there is refrigeration equipment, lighting in large rooms, sometimes a three-phase supply and several distribution boards. A report for such premises covers each board and its circuits, so you first need to know how many there are and where they are.
If you rent the premises, find out whether the lease says who orders the electrical installation testing. If the owner already has an earlier report, a copy of it shows the circuit numbering and what was measured last time.
In your request, write the floor area, the number of distribution boards, whether there is lightning protection and at what times the equipment can be switched off briefly. For how company premises are tested, see electrical installation testing for businesses.
Old wooden house without handover papers
The typical development of Maskavas forštate is pre-war wooden and masonry buildings, courtyard buildings and commercial areas by the market and railway. If a house or its extension was once altered without a building authority case or has never been put into use, the electrical part may need documents on the current condition, such as an as-built diagram, measurements and a report. The building authority says which ones exactly.
Before the site visit, find everything that has survived about the house: the cadastral survey file, old plans, earlier electrical papers. They show which parts of the building are original and which extensions are later, and which part of the installation has to be described.
A concealed works record is not recreated after the work has been covered up; ask the building authority what it accepts instead. In Riga buildings are accepted into use by the municipality’s City Development Department, and that is where you need to find out which document set your case requires. We prepare the electrician’s part after the site visit. More: electrics of an old or never handed over house.
Empty premises after a long break: reconnecting the supply
If a building or shop premises by Maskavas iela have stood without a user for a long time, the electricity connection may have been cut off. The Sadales tīkls reconnection terms depend on how soon after the previous user left the electricity supplier you choose submits the reconnection application, and on whether the load or number of phases stays unchanged.
If you plan more capacity or more phases in the premises than the previous user had, this is no longer a simple reconnection. Then a load increase has to be applied for, and the terms and fees are different.
| Situation | What Sadales tīkls sets |
|---|---|
| Application within 30 days after the previous user ended the contract with the supplier | The connection is restored without a fee |
| Application later | Connection fee €34.76 (0.4 kV) and a capacity maintenance fee for the time since the contract was terminated, for no more than 24 months |
| The connection meets the reconnection conditions | Invoice within 3 working days, reconnection within 2 working days after payment |
| The internal installation has not been tested for a long time | Sadales tīkls advises having a certified electrician test it before applying; if the installation is not fit for use, the connection cannot be restored |
Checked on 25 November 2026: Sadales tīkls “Reconnection” and price list (sadalestikls.lv). Fees under the Sadales tīkls price list, checked on 25 November 2026.
We carry out this test and prepare the papers; you pay the Sadales tīkls fees to Sadales tīkls according to its invoice. For the steps, see reconnection after an interruption.
What the test protocol records in an old building
In dense historic development one address may have a street building, a courtyard building and several users with their own distribution boards. So the protocol says clearly which board and which circuits were measured, what was measured with what and what the results are. If these places are not in the description, it is hard to prove later what the protocol refers to.
In the protocol you will see a list of circuits with their protective devices, insulation resistance, phase-neutral loop impedance, earthing results and a conclusion on compliance. What each line means is explained on the page what a test protocol contains.
The protocol also has the date of measurement and the measuring instrument details, so that it can later be checked what was used and when. If a building has several users, each can have their own part prepared, and a tenant does not receive the results for other premises.
What papers for a shop or house in Maskavas forštate cost
Measurements and documentation for putting a private house into use cost from €230. For measurements and documents for a shop or warehouse, and for documents for Sadales tīkls, the price is set after the site visit. It depends on the floor area, the number of distribution boards and circuits and whether the incoming supply and distribution board suit the capacity needed. The site visit is paid: €40.
Prices cover the electrician’s work and the documents. Sadales tīkls and building authority fees are separate. The documents are prepared and signed by a certified electrical specialist.
Sources
- Reconnection: 30 days, then connection and capacity maintenance fees for up to 24 months; invoice within 3 working days, reconnection within 2 working days; advice to test the installation checked 25 November 2026
- Connection fee €34.76 (0.4 kV) checked 25 November 2026
- In Riga acceptance into use is handled by the City Development Department checked 25 November 2026