For each circuit it records insulation resistance, phase-neutral loop impedance, the earthing result and operation of the residual current device. A detached house needs the protocol for putting into use or after alterations, an office or warehouse needs it with the handover of the premises. If you plan an electric car charger in the yard, the connection capacity also has to be checked.
A detached house next to warehouses: what is measured and what goes into the protocol
The typical development of Šampēteris is detached houses, low-rise buildings, offices, warehouses and commercial areas. So one street can bring two quite different orders. A detached house has one incoming distribution board, a warehouse has several boards and more capacity. In your request, write which of these your property is, so that the electrician knows what scope to expect.
In a private house test the following is measured and entered in the protocol:
- insulation resistance for each circuit, with all appliances disconnected;
- phase-neutral loop impedance, which shows whether the protective device will operate in a short circuit;
- earthing resistance and continuity of the earthing conductor to the sockets;
- the operating current and time of residual current devices (RCD);
- an as-built diagram, if the distribution board has no up-to-date diagram.
When each circuit is measured separately, the power is switched off for a short while. If the house has a heat pump, an aquarium or a server, say so in advance so that the shutdown can be planned. Before the site visit, a photo of the inside of the distribution board door is useful, as is the old diagram or design, if there is one.
If you built the house yourself, these measurements together with the diagram are part of the papers for the building authority. If the house has long been in use, the protocol shows which circuits comply and which need putting right. How it works: electrical installation testing in a private house.
Office, shop or hotel premises: concealed works records before the ceilings are closed
People in Šampēteris live, work in offices, trade, work in logistics and hospitality. If premises are altered with a building authority case, the electrical papers become part of acceptance. Riga municipality’s list of documents for acceptance into use includes acceptance records for significant structures and concealed works, the construction log and an opinion on the readiness of the engineering network connection.
A concealed works record confirms that cables in walls, in the floor or above suspended ceilings were laid correctly before they were covered. A concealed works record is not recreated after the work has been covered up; ask the building authority what it will accept instead. So call in the electrician while the cable routes are still visible, and photograph them with a tape measure alongside.
In a warehouse or logistics building with several distribution boards, each board has its own part in the protocol. If you rent the premises, agree with the owner whether only the circuits of your premises are tested or also the main board and incoming supply. This determines in whose name the report is issued and who keeps it.
In your request, state the floor area, whether there is a construction design and how many boards the premises will have. For how premises are handed over, read the page putting office premises into use.
A charger at the house or office parking space: will the existing connection be enough
The airport and main roads, Kārļa Ulmaņa gatve and Lielirbes iela, are close to Šampēteris. So detached houses and offices with their own parking face the same question: is the existing connection enough for an electric car charger, or does a capacity increase have to be applied for.
Sadales tīkls advice of 7 September 2026 says that a typical private house connection is three phases at 20–25 A, which is 13.8–17.3 kW. A smart charger with dynamic load management often makes it possible not to increase capacity, because it reduces charging when other large appliances are switched on in the house. This is Sadales tīkls advice, and it is not a legal document.
Checked on 25 November 2026: Sadales tīkls advice on charging an electric car at a private house (7 September 2026), sadalestikls.lv.
Before installation we check the existing distribution board, the incoming supply protection, the cable route to the charger and the protective devices. The installer installs the charger; we test and prepare the papers. To see what this test contains, go to the page electric car charger connection test.
What a house protocol and office papers cost
Measurements and documentation for putting a private house into use cost from €230. For an office or warehouse we quote the price after the site visit: it is set by the floor area, the number of distribution boards and circuits and whether a thermal camera inspection is needed. For a charger connection test the price is set after the site visit, because it depends on the distance to the board, the existing connection capacity and whether the capacity at Sadales tīkls has to be increased.
The site visit is paid: €40. Prices cover the electrician’s work and the documents. Sadales tīkls and building authority fees are separate. The documents are prepared and signed by a certified electrical specialist, and after the site visit we tell you which papers your property needs.
Sources
- Sadales tīkls advice: typical private house connection 3 phases 20–25 A (13.8–17.3 kW), smart charger with load management checked 25 November 2026
- Riga municipality’s list of documents for acceptance: concealed works records, construction log, engineering network connection opinion checked 25 November 2026