Sauna electrical installation documents and special requirements
Point 27 of LBN 261-15 names places with special requirements for electrical installations. Two of them fit a sauna building: places where sauna heating appliances are located (27.3) and rooms with a bath or shower (27.1). So the sauna documents look separately at the heater circuit, the shower room and the lighting.
In a new or altered installation, point 28.¹ requires a residual current device (RCD) with a tripping current of no more than 30 mA for household lighting circuits and general sockets up to 32 A. The class of the residual current device, in the heater circuit too, is chosen according to the type of equipment to be connected (point 28.³).
Checked on 25 November 2026: LBN 261-15 points 27, 28.¹–28.³, 52–55 (likumi.lv/ta/id/274674).
Putting a garage and an outbuilding into use
A garage, shed or workshop often gets electricity through a cable from the house distribution board. The test measures the insulation resistance of this cable, the phase-neutral loop (whether the breaker will disconnect the circuit in case of a fault) and the protective conductor bond to the parts that must be earthed.
For sockets to which portable equipment used outdoors up to 32 A is connected, point 28.¹ requires 30 mA protection. In a garage this applies, for example, to a socket by the door where a lawnmower or a pressure washer is plugged in.
If the outbuilding has a workshop with three-phase equipment, write that in the form. The site visit then also looks at the circuits for this equipment and their protection in the house distribution board.
A separate building or part of the house installation
| Situation | What is tested | What to ask the building authority |
|---|---|---|
| Building with a cable from the house distribution board | The cable, the circuits in the building, the protective devices in the house board | Whether the documents are submitted together with those of the house or separately |
| Building with its own distribution board and meter | Its own incoming supply, earthing, all circuits | Which process applies to this building |
| Sauna inside the house | The heater circuit and shower room as part of the house | Whether the house documents are enough |
For small buildings, Cabinet Regulation No. 529 provides for a construction notification or an explanatory note, while for some works no construction design documents are required (point 7). Which applies to your sauna or garage depends on the building’s size, group and the works, and the building authority tells you. With a notification, completion is confirmed in BIS by attaching reports on utility network readiness, and for a new Group 1 auxiliary building also an as-built survey plan and façade photos.
What to prepare before the site visit
- The power and model of the sauna heater, if known, or a photo of the heater’s data plate.
- Information on where the cable from the house runs: underground, overhead or along a wall.
- Access to the house distribution board and the building’s board, if there is one.
- The building authority’s letter or the status of the BIS case, if the process has already started.
How much electrical documents for a sauna or garage cost
- As-built diagram / distribution board diagram: price after the site visit
- Site visit: €40
- For a private house: measurements and documentation for putting a private house into use from €230
Prices cover the electrician’s work and the documents. Sadales tīkls and building authority fees are separate. For a separate sauna or garage we quote the price after the site visit: it depends on the number of circuits, whether the building has its own distribution board, how long the cable is and whether there is an old diagram. If we test the building together with the house, see the page electrical installation testing in a private house.
Sources
- LBN 261-15 points 27, 28.¹–28.³, 52–55 checked 25 November 2026
- Cabinet Regulation No. 529: construction notification, explanatory note checked 25 November 2026