If both are fed from one distribution board, the measurements are taken together and entered in one report. If the workshop has its own meter and distribution board, it is a separate part with its own circuits and its own price. A battery added to a solar system needs different papers.
Workshop or warehouse: a report you can show a tenant
Jaunciems serves housing, production, warehousing and local services. A workshop has different loads from a house: welding machines, compressors, woodworking machines, and some of them may be three-phase. The test report records the insulation resistance and the phase-neutral loop result for each circuit, and on three-phase lines it has to be measured on every phase.
In a workshop the measurements also show what is not seen day to day: whether extension leads and portable equipment are connected to circuits with the right protection, and whether earthing reaches every metal casing. If the installation has been added to piece by piece over time, the site visit first traces which line comes from which distribution board, and only then are measurements taken.
If you let out the workshop, the report shows the tenant the condition in which they receive the installation. If you are the tenant, ask the owner whether there already is a report and when it was drawn up. For what the work includes, see electrical installation testing for businesses. In your request, write the power of the largest machines and at what times they may be switched off.
Detached house and apartment building: what differs in testing
The typical development here is detached houses, apartment buildings, and industrial and warehouse sites. In a detached house the test covers everything: the incoming supply, the main distribution board, all circuits and, if there are any, the lines to outbuildings. In an apartment building a flat owner orders measurements only for their own circuits, while testing of the shared part is organised by the building manager.
For a detached house a measurement protocol may be needed for putting into use, after alterations or for yourself, to know the condition. For what a private house test includes, see private house electrical installation testing. If the workshop is next to the house and fed from the same distribution board, mention it: then both can be measured in one visit.
In an apartment building in Jaunciems the flat’s distribution board may be in the stairwell. In that case write in your request whether you have access to it or the manager holds the key, because the measurements cannot start without it.
Battery added to a solar system: a protocol for each inverter
A detached house or workshop may get a battery added to its solar system. Sadales tīkls treats a battery as generating equipment, so it needs permission in the same way as panels. Each inverter needs its own settings protocol, and the total inverter capacity must not exceed the microgenerator limit: 11.1 kW on a three-phase connection and 3.7 kW on a single-phase connection. A hybrid inverter is allowed.
| Situation | What has to be submitted to Sadales tīkls |
|---|---|
| New microgenerator with a battery | One application with the battery marked |
| Battery added to an existing system | Application at e-st.lv to change the technical parameters of the microgenerator |
| Battery without panels | New application with the battery as the only source |
| Several inverters | A settings protocol for each inverter |
Checked on 25 November 2026: Sadales tīkls, “Connecting a battery”; a battery is generating equipment, a protocol for each inverter.
Under the Sadales tīkls requirements, installing a battery and setting up the inverter must also be done by a holder of a certificate for generating equipment. We do not carry out the installation, but we check and prepare the documents. The protocol is signed by a specialist whose certification covers generating equipment. For everything about this case, see battery connection documents.
Two meters on one property: relocating or merging
If the house and the workshop each have their own meter, you may want to merge them or move them to a more convenient place. To merge meters, an electrician prepares the installation and Sadales tīkls removes the surplus meter. For a move inside the building the application is submitted at e-st.lv, a certified electrician removes the seal with permission from Sadales tīkls, and Sadales tīkls restores it within 3 working days.
If the meter has to be moved outside the building, for example to the plot boundary, you need an application in the technical portal and a design assignment from Sadales tīkls. For the steps of both routes, see meter relocation. With your request, photograph both meters and the main protective devices.
When meters are merged, the permitted capacity may change. If the workshop needs as much capacity as before, make sure that the combined main protective device allows it, otherwise you will have to apply for a capacity increase after the merger.
Price for a workshop, a house and battery papers
For measurements and documents for a workshop or warehouse the price is set after the site visit, because it depends on the floor area and the number of distribution boards and circuits. Measurements and documentation for putting a private house into use cost from €230. For documents to connect a battery or hybrid inverter the price is set after the site visit: what matters is the number of inverters and the total capacity against the 11.1 kW limit. The site visit is paid: €40.
Prices cover the electrician’s work and the documents. Sadales tīkls and building authority fees are separate. The documents are prepared and signed by a certified electrical specialist.
Sources
- A battery is generating equipment; a protocol for each inverter; types of application checked 25 November 2026
- Microgenerator up to 3.7 kW on a single-phase and 11.1 kW on a three-phase connection checked 25 November 2026
- Meter relocation and merging; seal restored within 3 working days checked 25 November 2026
- The protocol is signed by a specialist with the generating equipment field checked 25 November 2026
- General technical requirements, point 9: installation and inverter setup are carried out by a construction specialist with the generation specialisation checked 25 November 2026