Electrical paperwork in Suži - low-density housing near Ķīšezers

Electrical paperwork in Suži: what has to be sorted out if you are building a house yourself, and what if panels are going to appear on the roof?

After you send the form, we contact you within 5 minutes

What it costs
Measurements and documentation for putting a private house into use Private house from €230
As-built diagram / distribution board diagram Building area and number of floors, number of distribution boards and circuits, whether there is an old diagram or design, how many cable routes have to be traced on site Price after the site visit
Solar panel / microgenerator papers for Sadales tīkls and the inverter settings protocol Number and type of inverters (grid-tied, hybrid), whether the inverter is on the Sadales tīkls list of recognised inverters, whether the installer’s mistakes need correcting. The Sadales tīkls assessment fee, €78.66, is separate Price after the site visit
Site visit The electrician’s call-out and check on site, paid €40

All prices and how they are set

Request a site visit

The site visit is paid: €40.

After you send the form, we contact you within 5 minutes

Illustration: private houses in the Riga region

For putting a self-built house into use you need electrical installation test documentation: measurements and, if the building authority asks, also a diagram. It is easier to prepare while the walls are not yet closed. Panels have their own deadline: after Sadales tīkls approval the microgenerator has to be installed within 9 months. More permitted capacity is a third, separate question.

A self-built house: measure before finishing, not after

The typical development of Suži is detached houses, gardens, low-rise buildings and large natural areas. If you are building a house yourself, Building Construction Regulations (points 157.7.1 and 168.1) require electrical installation test documentation for acceptance into use. The most important advice here is about timing: call in the electrician while the cables in walls and ceilings are still visible.

Once the wires are covered, some information can no longer be checked by eye. A concealed works record is not recreated after the work has been covered up; ask the building authority what it will accept instead. So if you are still at the construction stage, photograph the cable routes before the cladding goes on, with a tape measure or marks on the wall. They are useful both for the diagram and for later work.

For the full list of documents in this case, see the page electrical documents for a self-built house. If the house is already finished and there are no photos, that is all right: measurements can be done now too, but the routes in the diagram are then traced from what is visible in the board and junction boxes.

An as-built diagram that also shows the sauna and shed

On detached house plots in Suži there may be a garden, sauna, garage or shed next to the house. The as-built diagram (an electrical diagram showing what was actually built) covers everything fed from your distribution board. If a cable runs from the house to the sauna or shed, the diagram also shows that line, its protection and the second board, if there is one. This matters, because years later no one will remember where the cable runs underground.

Useful for the diagram: design sheets, if there are any, a photo of the board with circuit labels and a rough plan of the plot with the buildings. For how the diagram is prepared and what it contains, read the page as-built diagram. If the line of some building is unknown, it is traced on site, and that affects the scope of work.

Panels on the house: 9 months after Sadales tīkls approval

Suži’s functions are housing, recreation and local services, and the roof of a detached house can become a place for solar panels. A microgenerator has its own deadline with Sadales tīkls that is easy to miss. After approval the microgenerator has to be installed within 9 months; this deadline can be extended once by up to 6 months.

  1. Application on e-st.lv Microgenerator application with inverter data; Sadales tīkls replies within 3 working days if the inverter is on the list of recognised inverters.
  2. Paying the invoice Assessment fee €78.66 under the Sadales tīkls price list, checked on 25 November 2026.
  3. Installation within 9 months Installation and inverter adjustment are done by a construction specialist with a certificate in the generation field; one extension of up to 6 months.
  4. Confirmation with protocol A confirmation is submitted on e-st.lv, attaching the inverter settings protocol signed by a specialist whose field covers generating equipment.

Checked on 25 November 2026: Sadales tīkls, “Connecting a microgenerator”; installation within 9 months after approval, one extension of up to 6 months.

If after payment the installer offers a different inverter, you do not have to start from scratch. Sadales tīkls accepts a confirmation with the data of the originally declared inverter and the new inverter’s protocol attached, if the new one is on the recognised list and its power is not greater than declared. Otherwise a new application is needed.

We check what has been installed and prepare the papers for Sadales tīkls; we do not install panels. For everything about this work, see the page connecting a microgenerator.

When a house needs more permitted capacity

Access to Suži is provided by Jaunciema gatve and local roads, and if a house is lived in all year round, a heat pump, electric heating or an electric car charger may appear. If the total simultaneous load exceeds the main protective device, the protection trips or appliances have to be switched on in turn. This is a signal to check whether more permitted capacity is needed.

Before an application to Sadales tīkls, the electrician assesses whether the board and incoming cable suit the new capacity and whether a move to three phases is needed. The fee to Sadales tīkls follows its price list and depends on whether the network has to be rebuilt. For the process, see the page increasing the permitted capacity. If you also plan panels at the same time, mention that in your request, because both questions concern the same incoming supply.

Price of house papers, a diagram and panels

Measurements and documentation for putting a private house into use cost from €230. For an as-built diagram the price is set after the site visit: it is determined by the number of distribution boards and circuits, whether there is an old diagram or design and how many cable routes have to be traced on site. For panel papers for Sadales tīkls the price is also set after the site visit, because it depends on the number and type of inverters. The site visit is paid: €40.

Prices cover the electrician’s work and the documents. Sadales tīkls and building authority fees are separate.

Sources

  1. Building Construction Regulations, points 157.7.1 and 168.1: electrical installation test documentation for a self-built house checked 25 November 2026
  2. A microgenerator has to be installed within 9 months after approval, one extension of up to 6 months; reply in 3 working days; permit in 3 working days checked 25 November 2026
  3. Microgenerator assessment fee €78.66 checked 25 November 2026
  4. General technical requirements, point 9: installation and inverter adjustment are done by a construction specialist with a generation specialisation checked 25 November 2026

Page updated 25 November 2026.

Sort out house papers in Suži

Tell us whether the house is still being built, whether there are outbuildings and whether you plan panels.

Get a price

The site visit is paid: €40.

Questions: Electrical paperwork in Suži

How soon after the permit does a microgenerator have to be installed?

Sadales tīkls sets 9 months after the connection approval, and this deadline can be extended once by up to 6 months. After installation a confirmation with the inverter settings protocol is submitted on e-st.lv, and Sadales tīkls issues the permit for parallel operation within 3 working days of receiving the documents.

Do outbuildings also have to be shown in the diagram?

Yes, if they are fed from your distribution board. The as-built diagram shows everything that has actually been built, including the line to a sauna, garage or shed and its protection. If an outbuilding has its own board, the diagram shows that too.

When does a house need more permitted capacity?

When the planned appliances together with the existing ones need more at the same time than the main protective device allows, for example when adding a heat pump or charger. At the site visit the electrician compares the load with the incoming supply and board, and then it is clear whether an application to Sadales tīkls is needed.

Sort out house papers in Suži

Fill in the form: name, phone and address. After you send the form, we contact you within 5 minutes.

Request a site visit

The site visit is paid: €40.

After you send the form, we contact you within 5 minutes

Get a price we contact you within 5 minutes